-40%

1900W Gas Demolition Jack Hammer Concrete Breaker Punch Chisel Bit 1500BPM 52cc

$ 128.88

Availability: 10 in stock
  • Power Source: Electric
  • Fuel Tank Capacity: 1.3L
  • MPN: Does Not Apply
  • Refund will be given as: Money back or replacement (buyer's choice)
  • Starter system: Hand pull start
  • Cylinder diameter * stroke: 44×34 mm(1.73×1.34 inches)
  • Shipping notice: Can not ship to Puerto Rico,Alaska/Hawaii
  • Max torque and speed:: 3.5N.m/5000r/min
  • All returns accepted: Returns Accepted
  • Size: 690×370×270mm(27.17x14.57x10.63 Inch)
  • Max impact: 20-55J
  • Displacement:: 52CC
  • Item must be returned within: 30 Days
  • Max power and speed:: 1.9K W/6500r/min
  • Condition: New
  • Brand: Unbranded
  • Material: Steel+PP
  • Item location: CA /NJ /Austell
  • Return shipping will be paid by: Seller
  • Spark plug type:: BM6A
  • Impact Frequency:: 1500BPM
  • Fuel: mixing oil(gasoline 25, two-stroke engine oil 1)
  • Type: Demolition Concrete Jack Hammer Breaker
  • Restocking Fee: No

    Description

    Store category
    Sign Up Now !
    You may also like
    52cc 2Stroke Gas Demolition Jack Hammer Concrete Breaker Drill with Drill
    Product Description
    (
    Please note:
    This product is heavy on top and light on bottom. It is easy to fall when standing upright. Please pay attention to the posture to avoid falling and damaging the machine)
    This product is heavy and light, easy to fall in the vertical state, please pay attention to posture to avoid falling and damage the machine, due to falling products damaged, the company does not assume after-sale responsibility.
    Product key data
    Engineer type:44mm, Single eylinder, air coling,
    2 stroke
    Fuel:mixing oil(gasoline 25, two-stroke engine oil 1)
    Fuel tank capacity:1.3L
    Displacement:
    52cc
    Max power and speed:
    1.9K W
    /6500r/min
    Max torque and speed:3.5N.m/5000r/min
    Consmption rate:≤0.6L/h
    Impact fregnency:1500Bpm
    Impact enengy: 20-55J
    Starter system:Hand pull start
    Net weight :20.5 kg(45.19lb)
    Dimensions: 690*370*270mm(27.17*14.57*10.63inch)
    Cylinder diameter * stroke :44×34 mm(1.73×1.34 inches)
    spark plug model: BM6A
    Main use and feature
    Use
    I It can use on building construction ,road building project in the broken .
    2 Break cormerstone for the railway road and tamp sleepers tamping work .
    3 Power embedded in the telecommunications cables broken ditching work
    4 Cold water and ice breaking region ,the frozen road digging shovel to clear cutting of destroying
    other destroying other strong areas.
    Features
    1 It is the world's lightest weight , lowest displacement engine type gasoline hammer handheld
    2 A perfect body and“V"" linear operation, minmizing the hands of vibration, has significant control of
    convenience and comfort, the operator can shovel digging a 360 degree rotation.
    3 It can regulate the number of impact energy and impact ,apply for a variety of materials suitable for construction .
    4 Applications: Our machine is suit in many kinds of situations ,such as crashing project in road-building ,ectric power , telecom ,tclecom , and cable ,ditch these kinds of crashing work .
    5. small size, simple structure, easy operation, durable and beautiful
    6. comfortable handle
    Anti-slip comfortable handle, anti-slip, anti-loosening, better handle, safer to use
    7. cooling ventilation settings
    Ventilation around the machine to ensure timely engine heat dissipation
    8. chisel speed, high efficiency
    Advantage :
    If you use our machine ,then you can ignore the trouble of diesel engine and pressing machine ,trucking-lorry this kind of heavy equipment, which will not limited by the pipe line , electric line ,cable no matter how high and how far ,we can work situation .
    Packing list:
    Machine+drill*2+
    Proportioning bucket+funnel+filter+small accessories*7
    Instruction of safe operation
    I. The operator need wear sip-esistant safety shoes. Appropriate clothing. Wear goggles and helmet,
    wear earplugs for a long time operation.
    2. Balance body when you operation the machine .Operating the machine in a right position.
    3. Prohibit smoking when you operate the machine .
    4. When you lift machine , the first control you need dial to reach the minimum scale, let the machine
    to slow down .
    5. Tell idlers away from the work area avoid injury. The process of using machine may lead to gravel
    flying to idler.
    6. Select medium-speed gasoline hammer to run for the best . Control dial to between 3 to 4 in scale.
    7. In the use of operation,the operator is not equal to the greater pressure crushing,stamping,
    consolidate faster, try to use the weight of the machine itself , the force should be reasonable in order to achieve high eliciency and easy operation results.
    8. Gasoline hammer for crushing, stamping ,solid work,the work can not be used to pry the stone.
    9. Maintain the handles dry , clean ,no oil or fuel mixture.
    10. Stop the operation midway; you must turm off the engineer.
    11. Every time please check normal fastening screws of the connector before use ,if loose ,must
    tighten the screws can be used .
    12. Prohibition only pure gasoline (without two-stroke engine oil )for fuel .
    13. Gasoline is highly flammable, so to refuel in a welll ventilated environment. When you add oil,
    please stop gasoline engine.
    14. Do not add oil too full ,do not leave the fuel fllere in neck part of machine. If overflow or silld
    fuel :wait the fuel all volatilization ,then you can start machine.
    15. After refueling ,tighten the oil lid ,Please check frequently whether the damage the fuel tank
    leaks ,if found damaged replace immediately.
    16. Reserve oil in storage areas , Remove all the root causes of fire or cause sparks.
    17. In closed areas ,such as tunnels ,trenches and deep groove in the work environment when using
    gasoline hammer to ensure suficient fresh air, exhaust gas containing carbon monoxide
    dangers ,should bring electric fan for air flow .
    ( 18. Forbid quickly aceleratle or brake, so as not to damage the machine.
    19. Avoid the impact of fragmentation work against the machine in the context of high speed
    operation .
    20. Transfer site long-distance transport ,should be emptying the tank .
    21. Prohibit substandard maintenance staff dismount gasoline hammer ,1o avoid structural damage to parts , resulting in shortened life of gasoline hammer and accidents .
    Payment
    Delivery details
    Terms of sales
    About us
    Contact us
    Payment
    We accept ebay payment 。
    Fees such as import duties, taxes are not included in the item price or shipping costs. These charges are the buyer's responsibility.
    Delivery details
    Shipping:
    The item will be shipped from our US warehouse to United States, which is more faster than from aboard.
    2-9 working days to: USA
    Terms of sales
    We maintain high standards of excellence and strive for hundred percent customer satisfaction. Feedback is very important to us. We hope that you contact us immediately before you give neutral or negative feedback, so that we can address your concerns. It is impossible to address issues if we do not know about them!
    About us
    Your satis
    faction is our ultimate goal. We work hard to earn your trust and future business. Our certified technicians have tested each item before shipping. The unit comes with 1 year limited warranty on all manufacturing defects.
    a) If you receive a defective item, you may return it or ask for a discount. Please contact us within 14 days after you receive the package.
    b) What you returned must be intact and in its original packaging as re? u. Customer is responsible for shipping costs of the returned item.
    c) We will cover the cost of shipping back t with the shipping rate indicated in the registration page. We will send you a new unit or refund the full payment you paid.
    Thank you.
    Contact us
    Business Hour
    Business Hour: Monday To Friday: 8:30 AM to 5:00 PM (Beijing China time)
    Due to time zones, our reply to your questions may not be immediately. But within above working time, we will reply your email within 24 hours. If it's non-workdays, please kindly be patient and wait till Monday.
    Please contact us with ebay message.
    Please feel free to contact us if you have any questions.
    : Monday To Friday: 8:30 AM to 5:00 PM (Beijing China time)
    Due to time zones, our reply to your questions may not be immediately. But within above working time, we will reply your email within 24 hours. If it's non-workdays, please kindly be patient and wait till Monday.
    Please contact us with ebay message.
    Please feel free to contact us if you have any questions.
    Feedback
    On Jun-30-21 at 01:59:20 PDT, seller added the following information: